- 2011 Bakun Hydroelectric Project, CW2 Package located at Sarawak Malaysia Project Own by Sarawak Hidro Sdn Bhd
- 2010 1st Avenue Mall Penang Project own by 1st Avenue Mall Sdn Bhd
- 2009 St Jude Medical-HVAC & Process Utilities Project own by St Jude Medical Inc
- 2004 Penang Christian Center
- 2003 Penang Buddhist Association
Current Project
Project 1
Project Description | Oryx Advance Material Phase 4 Mechanical Services work -GA & HIP 2 area |
Project Owner | LB Brothers Sdn Bhd |
Scope Of Work | HVAC Air Conditioning System |
Start Date | Aug 2016 |
Completion Date | March 2017 |
Project 2
Project Description | Infineon kulim Hi Tech Park – To Service Air Conditioning & heating system |
Project Owner | Infineon (M) Sdn Bhd |
Scope Of Work | HVAC Air Conditioning & Ventilation System |
Start Date | Feb 2016 |
Completion Date | Oct 2016 |
Project 3
Project Description | Alora Hotel Asthetik Property Group Sdn Bhd -Air Conditioning & Ventilation System |
Project Owner | Asthetik Property Group Sdn Bhd |
Scope Of Work | HVAC Air Conditioning & Ventilation System |
Start Date | Nov 2015 |
Completion Date | Dec 2016 |
Project 4
Project Description | Monthly Maintenace for integrated air cond system for Badan pengurusan Bersama Island Plaza |
Project Owner | Island Plaza Group (Penang) |
Scope Of Work | HVAC Air Conditioning & Ventilation System |
Start Date | Jun 2016 |
Completion Date | May 2018 |
Project 5
Project Description | Monthly maintenace for integrated air cond systmem at Aman Central Mall Alor Setar Kedah |
Project Owner | Great Realty Sdn Bhd |
Scope Of Work | HVAC Air Conditioning & Ventilation System |
Start Date | Oct 2015 |
Completion Date | Sept 2017 |
Completed Project
Project 1
Project Description | Penang Free School ACSU system installation |
Project Owner | Penang Free School |
Scope Of Work | Installation of ACSU system |
Completion Date | June 2014 |
Project 2
Project Description | CLHS Air Itam( Additional 1 new blok of 5 Story) Tambahan 27 No Bilik Darjah |
Project Owner | CLHS (Private) |
Scope Of Work | Supply, Delivery, installation, testing & Commissioning of the Mechanical & Electrical Services installation |
Completion Date | 31 Mar 2012 |
Project 3
Project Description | FIRST SOLAR BMS SYSTEM FOR FS M1 TO 6 EXPANSIONS |
Project Owner | FIRST SOLAR |
Scope Of Work | Installation of BMS wiring works for FS M1 to 6 Expansion Works |
Completion Date | 30 Oct 2013 |
Project 4
Project Description | UMW Toyota |
Project Owner | UMW Toyota |
Scope Of Work | UMW Toyota, Prai – To dismantle existing 5 slot linear diffuser and plenum bos |
Completion Date | Jul 2012 |
Project 5
Project Description | Auxpoint Industries Sdn Bhd |
Project Owner | Seng Huat Hang Sdn Bhd |
Scope Of Work | To modification existing air-cond ductwork and install new generator set & smoke spill fans system at Seng Huat Hang Sdn Bhd |
Completion Date | 31 August 2013 |
Project 6
Project Description | 5NPV (M) SDN BHD |
Project Owner | 5NPV (M) SDN BHD |
Scope Of Work | Packaging works at KLM1.5 equipment |
Completion Date | 30 Jul 2013 |
Project 7
Project Description | 5NPV (M) SDN BHD |
Project Owner | 5NPV (M) SDN BHD |
Scope Of Work | Dismantling works at KLM1.5 equipment |
Completion Date | 30 Jul 2013 |
Project 8
Project Description | Motorola Solution Sdn Bhd (HVAC) |
Project Owner | Motorola Solution Sdn Bhd |
Scope Of Work | To setup battery line at Depo (Mechanical) |
Completion Date | 1-May-2013 |
Project 9
Project Description | CARL CORRYNTON MEDICAL CENTRE |
Project Owner | Carl Carrynton Medical Centre |
Scope Of Work | TMC-ACMV works for L2 OT lab and recovery area installation |
Completion Date | May 2013 |
Project 10
Project Description | CARL CORRYNTON MEDICAL CENTRE |
Project Owner | Carl Carrynton Medical Centre |
Scope Of Work | Installation of refrigerant piping,wiring,control panel for air cooled split units(410A) at Level1 & Level4 for Carl Corrynton Medical Centre |
Completion Date | May 2013 |
Project 11
Project Description | SUNWAY HOTEL SEBERANG JAYA |
Project Owner | SUNWAY REIT MANAGEMENT SDN BHD |
Scope Of Work | Refurbishment works for Sunway Hotel Seberang Jaya (Supply, Delivery, Installation, Testing & Commissioning of Air conditioning & Mechanical Ventilation(ACMV) Services for Coffee house and Lobby at Ground Floor |
Completion Date | 31 March 2013 |
Project 12
Project Description | MEMC IPOH SDN BHD (MECHANICAL WORK) |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | General contractor for mechanical work for Supply and Installation of Air Compressor, Chilled water pipe & Process Vacuum System |
Completion Date | Feb 2013 |
Project 13
Project Description | SIMFONI BISTARI SDN BHD |
Project Owner | SIMFONI BISTARI SDN BHD |
Scope Of Work | Simfoni Bistari Sdn Bhd – Air Conditioning & Mechanical Installation Services |
Completion Date | 13 June 2013 |
Project 14
Project Description | SUNWAY HOTEL SEBERANG JAYA |
Project Owner | SUNWAY REIT MANAGEMENT SDN BHD |
Scope Of Work | Refurbishment works for Sunway Hotel Seberang Jaya(Supply, Delivery, Installation, Testing & Commissioning of Air conditioning & Mechanical Ventilation(ACMV) Services for Guest Room from level 3-5 |
Completion Date | April 2013 |
Project 15
Project Description | 5NPV (M) SDN BHD (Hook up) |
Project Owner | 5NPV (M) SDN BHD |
Scope Of Work | Mengubahsuai dalaman kilang sediada 1 tingkat dengan lantai mezanin di atas Lot PT25 (HSD41740), Jalan Hi-Tech 4, Kulim Hi-Tech Park, Kulim |
Completion Date | Sept 2012 |
Project 16
Project Description | Motorola Solution Sdn Bhd (HVAC) |
Project Owner | Motorola Solution Sdn Bhd |
Scope Of Work | Class 100 Cleanroom services installation |
Completion Date | Nov 2012 |
Project 17
Project Description | 5NPV (M) SDN BHD (HVAC Mechanical) |
Project Owner | 5 NPV (M) SDN BHD |
Scope Of Work | Mengubahsuai dalaman kilang sediada 1 tingkat dengan lantai mezanin di atas Lot PT25 (HSD41740), Jalan Hi-Tech 4, Kulim Hi-Tech Park, Kulim |
Completion Date | Sept 2012 |
Project 18
Project Description | MEMC IPOH SDN BHD |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | Mechanical contractor for CDA interlink |
Completion Date | Jul-12 |
Project 19
Project Description | GLENEAGLES MEDICAL CENTER PENANG 1 BLOCK 19 STOREY CLINIC & WARDS WITH CARPARK |
Project Owner | GLENEAGLES MEDICAL GROUP |
Scope Of Work | HVAC system |
Completion Date | Aug-12 |
Project 20
Project Description | Ideal Property -Build In Wiring & Air cond pipe system |
Project Owner | IDEAL PROPERTY DEVELOPMENT SDN BHD |
Scope Of Work | HVAC system |
Completion Date | Aug-2012 |
Project 21
Project Description | BAKUN HYDROLIC POWER PLANT SARAWAK |
Project Owner | SARAWAK HYDRO SDN BHD |
Scope Of Work | HVAC system |
Completion Date | March ,2012 |
Project 22
Project Description | Infineon Kulim |
Project Owner | Infineon Technologies (Kulim Sdn Bhd) |
Scope Of Work | To Supply and Install Process Water Pump 260K |
Completion Date | Mar 2012 |
Project 23
Project Description | MEMC Green Wax |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | To Install Green wax building |
Completion Date | Jun-12 |
Project 24
Project Description | Hamadatec at Kulim |
Project Owner | Hamadatec Sdn Bhd |
Scope Of Work | To supply and install cooling water system |
Completion Date | Mar-12 |
Project 25
Project Description | 1st Avenue shopping mall Cinemas – ACMV services |
Project Owner | Capital Land – 1st Avenue |
Scope Of Work | HVAC system |
Completion Date | October,2010 |
Project 26
Project Description | PARAMOUNT INTERNATIONAL SCHOOL -PENANG |
Project Owner | PARAMOUNT |
Scope Of Work | HVAC system |
Completion Date | Dec-11 |
Project 27
Project Description | VESTECH PMU AIR COND SYSTEM AT SG PINANG PENANG |
Project Owner | TNB NASIONAL BERHAD |
Scope Of Work | HVAC system |
Completion Date | Feb-11 |
Project 28
Project Description | MEMC Wire Saw |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | E500 Wire Saw (No10) tools installation at Slicing and lapping area |
Completion Date | Nov-11 |
Project 29
Project Description | Fondcare Sdn Bhd |
Project Owner | Fondcare Sdn Bhd |
Scope Of Work | To supply and install air condunits at TENDY International School at Penang |
Completion Date | Nov-11 |
Project 30
Project Description | SENG HUAT HANG FOR AMPHENOL TCS SDN BHD |
Project Owner | SENG HUAT HANG |
Scope Of Work | Retrofit work for ACMV |
Completion Date | Jul-11 |
Project 31
Project Description | MEMC IPOH (M) SDN BHD |
Project Owner | SENG HUAT HANG |
Scope Of Work | TODEOILER, EXPOXYREMOVER, EDGEREMOVER, EDGEPROFILER 6 & 7 TOOLS HOOK UP WORKS AT CLEAN ROOM |
Completion Date | Jul-11 |
Project 32
Project Description | 1ST AVENUE LINK BRIDGE AIR COND & VENTILATION |
Project Owner | Capital Land -1st Avenue |
Scope Of Work | HVAC & VENTILATION |
Completion Date | Jan-11 |
Project 33
Project Description | MEMC -SARAWAK SOLAR WAFER PLANT PROJECT |
Project Owner | MEMC |
Scope Of Work | BMS system |
Completion Date | January,2011 |
Project 34
Project Description | MOTOROLA PENANG TO INSTALL ACMV |
Project Owner | MOTOROLA |
Scope Of Work | HVAC system |
Completion Date | Feb-11 |
Project 35
Project Description | BENCHMARK ELECTRONICS (M) SDN BHD |
Project Owner | PENISULAR HO HUP ENGINEERING SDN BHD |
Scope Of Work | HVAC system |
Completion Date | Apr-11 |
Project 36
Project Description | TTE IBIDIN ASCU WORK AT SWITCH ROOM & ANALYST LAB |
Project Owner | IBIDIN |
Scope Of Work | HVAC system |
Completion Date | Feb-11 |
Project 37
Project Description | SOON HUP COOLING TOWER – TO REPLACE INFILL AND COIL AT WISMA SOON HUP SARAWAK |
Project Owner | SOON HUP GROUP |
Scope Of Work | COOLING TOWER |
Completion Date | Mar-11 |
Project 38
Project Description | CHEEKY DUCT RESTAURANT AT STRAITS QUEY PENANG |
Project Owner | CHEEKY DUCT |
Scope Of Work | TO INSTALL OF KITCHEN EXHAUST SYSTEM FOR CHEEKY DUCT ASIAN RESTAURANT |
Completion Date | 30-Oct-10 |
Project 39
Project Description | MEMC EPI PROJECT PHASE 1 & 2 |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | BMS SYSTEM |
Completion Date | 01-Nov-10 |
Project 40
Project Description | MEMC SUBSTATION – TO SUPPLY & INSTALL 11KV SUBSTATION SWITCHROOM |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | ELECTRICAL AND MEP |
Completion Date | 27-Dec-10 |
Project 41
Project Description | FIRST SOLAR MODULE 5 & 6-BMS WIRING WORK FOR FMCS |
Project Owner | FIRST SOLAR |
Scope Of Work | BMS SYSTEM |
Completion Date | 30-Dec-10 |
Project 42
Project Description | FLEXTRONICS PI CANTEEN AIR CONDITIONINIG UPGRADE WORK |
Project Owner | FLEXTRONICS |
Scope Of Work | HVAC SYSTEM |
Completion Date | 30-Nov-10 |
Project 43
Project Description | IAQ MEMC DUCTWORK & AIRCONDITIONING & MECHANICAL INSTALLATION SYSTEM WORK |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | HVAC SYSTEM |
Completion Date | 30-Nov-10 |
Project 44
Project Description | MEMC- TO INSTALL HOOK UP FOR 3RD EDGE GRINDER |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | HOOK UP |
Completion Date | 30-Oct-10 |
Project 45
Project Description | MEMC- TO INSTALL NTC TOOL INSTALL HOOK UP |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | HOOK UP |
Completion Date | 30-Oct-10 |
Project 46
Project Description | St Jude connection – Process Utilities |
Project Owner | St Jude Medical Inc |
Scope Of Work | Mechanical process sytem |
Completion Date | 01-Aug-10 |
Project 47
Project Description | Carsem AHU M Site -HVAC System |
Project Owner | CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak |
Scope Of Work | HVAC system |
Completion Date | 01-Sep-10 |
Project 48
Project Description | NGC Garter – HVAC & Process Utiulities |
Project Owner | NGC Garter |
Scope Of Work | HVAC and Mechanical process system |
Completion Date | 01-Jun-10 |
Project 49
Project Description | MEMC GI Gutter |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | CSA |
Completion Date | 01-Jun-10 |
Project 50
Project Description | ST Jude Medical -Process Utilities |
Project Owner | St Jude Medical Inc |
Scope Of Work | Mechanical process sytem |
Completion Date | 12 Feb 2010 |
Project 51
Project Description | ST Jude Medical -HVAC |
Project Owner | St Jude Medical Inc |
Scope Of Work | HVAC system |
Completion Date | 12 Feb 2010 |
Project 51
Project Description | ST Jude Medical -HVAC |
Project Owner | St Jude Medical Inc |
Scope Of Work | HVAC system |
Completion Date | 12 Feb 2010 |
Project 52
Project Description | TTEIbidin VRV at Penang Sains Park – VRV system |
Project Owner | IBIDIN |
Scope Of Work | VRV system |
Completion Date | Dec 2009 |
Project 53
Project Description | MEMC IPOH SDN BHD -HVAC & Air cond system |
Project Owner | MEMC IPOH SDN BHD |
Scope Of Work | HVAC system |
Completion Date | July 2009 |
Project 54
Project Description | OCBC -PENANG & BUTTERWORTH – Air Cond system |
Project Owner | JURUSTRAJAYA SDN BHD Lot 39B, Batu 5, Jalan Ampang 68000 Ampang Selangor |
Scope Of Work | HVAC system |
Completion Date | March 2008 |
Project 55
Project Description | PENTAMASTER TECHNOLOGY SDN BHD -HVAC system |
Project Owner | PENTAMASTER |
Scope Of Work | HVAC system |
Completion Date | Dec 2008 |
Project 56
Project Description | NADI PERKESO -ALOR SETAR -HVAC System |
Project Owner | PERKESO |
Scope Of Work | HVAC system |
Completion Date | Dec 2008 |
Project 57
Project Description | MOTOROLA PENANG -HVAC System |
Project Owner | MOTOROLA |
Scope Of Work | HVAC system |
Completion Date | Dec 2008 |
Project 58
Project Description | FIRST SOLAR BMS SYSTEM – MODULE 2 |
Project Owner | FIRST SOLAR |
Scope Of Work | BMS system |
Completion Date | June 2008 |
Project 59
Project Description | PETRONAS SEGAMAT (COMP STATION EXTENSION)- HVAC & Ventilation System |
Project Owner | PETRONAS |
Scope Of Work | HVAC system |
Completion Date | Dec 2008 |
Project 60
Project Description | SUBANG AVENUE – SHOPPING CENTER – SELANGOR – HVAC & Mechanical System |
Project Owner | BRUNDSFIELD |
Scope Of Work | HVAC system |
Completion Date | June 2009 |
Project 61
Project Description | NS COOLING TOWER OFFICE PRAI – HVAC system |
Project Owner | NS |
Scope Of Work | HVAC system |
Completion Date | Nov 2008 |
Project 62
Project Description | FIRST SOLAR BMS SYSTEM – MODULE 3 & 4 |
Project Owner | FIRST SOLAR |
Scope Of Work | BMS system |
Completion Date | Dec 2008 |
Project 63
Project Description | MUTIARA PARADE PENANG-HVAC & Mechnical System |
Project Owner | LION MUTIARA |
Scope Of Work | HVAC system |
Completion Date | March 2010 |
Project 64
Project Description | DELL PACIFIC – CHILLER REPLACEMENT |
Project Owner | DELL |
Scope Of Work | HVAC system |
Completion Date | Jan 2009 |
Project 65
Project Description | PERTUBUHAN KESELAMATAN SOSIAL (PERKESO) KEDAH – HVAC & Mechanical system |
Project Owner | PERKESO |
Scope Of Work | HVAC system |
Completion Date | 12 Nov 2008 |
Project 66
Project Description | CYGAL PROPERTIES-HVAC System |
Project Owner | CYGAL PROPERTIES |
Scope Of Work | HVAC system |
Completion Date | Dec 2009 |
Project 67
Project Description | PETRONAS KUANTAN (COMP STATION EXTENSION) – HVACSystem |
Project Owner | PETRONAS |
Scope Of Work | HVAC system |
Completion Date | Jan 2008 |
Project 68
Project Description | PRESIDE ENGINEERING SDN BHD – UNTUK MEMBINA 1 BLOCK KILANG DENGAN 2 TINGKAT PEJABAT DI ATAS PLOT 216 9(B) TAMAN PERINDUSTRIAN BUKIT MINYAK 13 SEBERANG PERAAI TENGAH FOR AIR COND SYSTEM – HVAC System |
Project Owner | PRESIDE ENGINEERING SDN BHD 45 & 42a, Kuantan Road 10150 Penang |
Scope Of Work | HVAC system |
Completion Date | 39,306.00 |
Project 69
Project Description | CARSEM (S) & (M)SDN BHD – PTTC OFFICE-HVAC System |
Project Owner | CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak |
Scope Of Work | HVAC system |
Completion Date | March 2008 |
Project 70
Project Description | JABIL CIRCUIT NEW AUDITORIUM-HVAC System |
Project Owner | JABIL CIRCUIT |
Scope Of Work | HVAC system |
Completion Date | 31 August 2007 |
Project 71
Project Description | BAYAN JAYA PENANG -HVAC & Mechanical |
Project Owner | BAYAN JAYA |
Scope Of Work | HVAC system |
Completion Date | Dec 2009 |
Project 72
Project Description | ORYX ADVANCED SDN BHD PENANG – HVAC & Ventilation System |
Project Owner | ORYX ADVANCED |
Scope Of Work | HVAC and Mechanical process system |
Completion Date | July 2008 |
Project 73
Project Description | FIRST SOLAR BMS SYSTEM – MODULE 1 |
Project Owner | FIRST SOLAR |
Scope Of Work | BMS system |
Completion Date | March 2008 |
Project 74
Project Description | MULTI NATIONAL COMPANY – PG7 TECHNICAL LAB – HVAC & Hook Up |
Project Owner | MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Scope Of Work | HVAC system |
Completion Date | 11 Nov 2006 |
Project 75
Project Description | MULTI NATIONAL COMPANY KM1 TIGC Q306 & Q207 – HookUp |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | Tools install project |
Completion Date | 12 June 2007 |
Project 76
Project Description | MULTI NATIONAL COMPANY – Q405 PROGRESSIVE BUILD AT KM2 – Hook Up |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | Tools install project |
Completion Date | 31 Oct 2006 |
Project 77
Project Description | MULTI NATIONAL COMPANY Q305 PROGRESSIVE BUILD AT PG8 & KM1 – Hook Up |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | Tools install project |
Completion Date | 30 Sept 2006 |
Project 78
Project Description | PENTAMASTER TECHNOLOGY(M) SDN BHD – Hvac & Mechanical |
Project Owner | PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang |
Scope Of Work | HVAC system |
Completion Date | 30 May 2005 |
Project 79
Project Description | MULTI NATIONAL COMPANY – PG7 7 FOL -Hook Up |
Project Owner | MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Scope Of Work | Tools install project |
Completion Date | 23 Dec 2005 |
Project 80
Project Description | MULTI NATIONAL COMPANY – PG8 BCR -Hook Up |
Project Owner | MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Scope Of Work | Tools install project |
Completion Date | 26 August 2005 |
Project 81
Project Description | MALAYSIAN BUDDHIST ASSOCIATION – HVAC & Mechanical |
Project Owner | MALAYSIA BUDDHIST ASSOCIATION JLN BURMAH PENANG |
Scope Of Work | HVAC system |
Completion Date | 23 May 2005 |
Project 82
Project Description | MULTI NATIONAL COMPANY – KM3 -HVAC & Mechanical |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | HVAC system |
Completion Date | 31 Mar 06 |
Project 83
Project Description | MULTI NATIONAL COMPANY – KM1 CMT 29-42 – Hvac & Mechanical |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | HVAC system |
Completion Date | 20 June 2005 |
Project 84
Project Description | HFB LASER TECH (M) SDN BHD- Hvac & Mechanical |
Project Owner | HFB LASER TECH (M) SDN BHD |
Scope Of Work | HVAC and Mechanical process system |
Completion Date | 30 April 2005 |
Project 85
Project Description | Apex Properties -Air cond & Ventilation Systems |
Project Owner | Apec Properties Sdn Bhd Plot 74 , Kawasan Perusahaan Bukit Tengah Mukim 11 Seberang Jaya Perai Tengah |
Scope Of Work | HVAC system |
Completion Date | 28 Feb 2004 |
Project 86
Project Description | GUYNEY PLAZA Office Renovation work For Hvac & Mechanical |
Project Owner | Gurnay Plaza Sdn Bhd 170-06-01 Plaza Gurney persiaran Gurney 10250 Penang |
Scope Of Work | HVAC system |
Completion Date | 15 Nov 2004 |
Project 87
Project Description | Widetech HVAC & Widetech Process System – HVAC & Process system |
Project Owner | Widetech Manufacturing Sdn Bhd Factory At Bayan Lepas Industrial Estate Mk 12.D.B.D Phase 4 Penang |
Scope Of Work | HVAC and Mechanical process system |
Completion Date | 38,077.00 |
Project 88
Project Description | Pentamaster Factory Extention HVAC system |
Project Owner | PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang |
Scope Of Work | HVAC system |
Completion Date | 38,046.00 |
Project 89
Project Description | Parti Gerkana Rakyat Malaysia – Air conditioning & mechanical Ventilation System |
Project Owner | Parti Gerakan Rakyat Malaysia No1 , 139 jalan Macalister Di Atas Lot 9 1312 Dan 1340 Sek 12, Bandar Georgetown |
Scope Of Work | HVAC system |
Completion Date | Dec 03 |
Project 90
Project Description | Multinational Companyy -Pg12 NPG Lab +_ ATD Lab -Hook Up |
Project Owner | Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam |
Scope Of Work | Tools install project |
Completion Date | Sept 03 |
Project 91
Project Description | Multi National Company – Km1 Q4-02 Progressive Build – Hook Up |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | Tools install project |
Completion Date | July 03 |
Project 92
Project Description | Multi National Company -Pg8 Combined Project -Hook Up |
Project Owner | MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Scope Of Work | Tools install project |
Completion Date | Sept 03 |
Project 93
Project Description | Compressor Assembly for Trane chiller No 2 |
Project Owner | Mega Express Air Conditioning Sdn Bhd 737-3-8 Sri Sungai Nibong Complex Jalan Sultan Azlan Shah b ayan Lepas Penang |
Scope Of Work | HVAC system |
Completion Date | July 03 |
Project 94
Project Description | MNC-KM1/Pg7 & PG8 Mechanical Exhaust System Upgrading |
Project Owner | MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Scope Of Work | HVAC system |
Completion Date | July 2003 |
Project 95
Project Description | PCC-Installation Air cond & Exhaust System of Penang Christian Center At jalan Khaw Sim Bee |
Project Owner | PENANG CHRISTIAN CENTER |
Scope Of Work | HVAC system |
Completion Date | Jan 2004 |
Project 96
Project Description | B & W Food Products Sdn Bhd -Hvac & Mechanical |
Project Owner | B&W Food Products Sdn Bhd 4765 Lorong Permatang Pauh 13400 Butterworth |
Scope Of Work | HVAC system |
Completion Date | Sept 2002 |
Project 97
Project Description | MNC, Supply, Installation, Delivery to Site T&C HVAC ducting, Piping & Utilities Work |
Project Owner | Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam |
Scope Of Work | HVAC system |
Completion Date | April 2002 |
Project 98
Project Description | MNC Company Km1 FCPGA Phase 2 General Contractor Package |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | General contractor |
Completion Date | Jan 2002 |
Project 99
Project Description | IClarm The World Fish Center -Headquarter Renovation Project |
Project Owner | International Center For Living Aquatics Resources Management -Jalan Batu Maung 11960 Bayan Lepas Penang |
Scope Of Work | HVAC system |
Completion Date | July 2001 |
Project 100
Project Description | ASIA Composite MFG -Hvac & Mechanical Package |
Project Owner | ASIA COMPOSITE MFG |
Scope Of Work | HVAC system |
Completion Date | Feb 2001 |
Project 101
Project Description | SITT TATT Industrial Gases – Wafer Tech At Kulim Hi Tech |
Project Owner | WAFER TECH |
Scope Of Work | HVAC system |
Completion Date | Dec 2000 |
Project 102
Project Description | Wafer Technology – Kulim Hitech Park – Hvac & Mechanical Package |
Project Owner | WAFER TECH |
Scope Of Work | HVAC system |
Completion Date | July 2000 |
Project 103
Project Description | MNC – FCPGA PPV/Tester Expansion |
Project Owner | MNC Plot 8-12 & 39 Phase1 Kulim Hi Tech Park 09000 Kulim |
Scope Of Work | General contractor |
Completion Date | October 2000 |
Project 104
Project Description | Applied Materials – Fit Out Work @ KHTP |
Project Owner | Bovis (M) Sdn Bhd Level 11, tower 1 MNI Twins 11 Jalan Pinang 50450 Kuala Lumpur |
Scope Of Work | General contractor |
Completion Date | July 2000 |
Project 105
Project Description | Federal Express -Air Cond & Ventilation System |
Project Owner | Iviron (M) Sdn Bhd 68-B Jalan Masjid Negeri 11600 Pulau Pinang |
Scope Of Work | HVAC system |
Completion Date | April 2000 |
Project 106
Project Description | IP Softcom (M) Sddn Bhd -Air Cond & Ventilation system |
Project Owner | MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang |
Scope Of Work | HVAC system |
Completion Date | March 2000 |
Project 107
Project Description | Muti National Company -KM1 Phase 3 -FCPGA -Hook UP |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Scope Of Work | Tools install project |
Completion Date | March 2000 |
Project 108
Project Description | Multi National Company KM1 – Retrofit – HVAC & Mechanical Package |
Project Owner | MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang |
Scope Of Work | HVAC system |
Completion Date | Mei 1999 |
Project 109
Project Description | Hamadatec at Kulim |
Project Owner | Hamadatec Sdn Bhd |
Completion Date | Dec 11 |
Project 110
Project Description | Ideal Property -Build In Wiring & Air Cond Pipe System |
Project Owner | Ideal Property Development Sdn Bhd |
Completion Date | December 2011 |
Project 111
Project Description | BAKUN HYDROLIC POWER PLANT SARAWAK |
Project Owner | SARAWAK HYDRO SDN BHD |
Completion Date | March 2011 |
Project 112
Project Description | Mr Ong Peng Chor 3 Storey bungalow House – To supply and installl VRF system installation work at Tanjung Pinang |
Project Owner | Mr Ong Peng Chor |
Completion Date | November 2010 |
Project 113
Project Description | 1st Avenue shopping mall Cinemas -ACMV services |
Project Owner | Capital Land -1st Avenue |
Completion Date | October 2010 |
Project 114
Project Description | PARAMOUNT INTERNATIONAL SCHOOL -PENANG |
Project Owner | PARAMOUNT |
Completion Date | Dec 11 |
Project 115
Project Description | VESTECH PMU AIR COND SYSTEM AT SG PINANG PENANG |
Project Owner | TNB NASIONAL BERHAD |
Completion Date | Feb 11 |
Project 116
Project Description | MEMC Wire Saw |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | Nov 11 |
Project 117
Project Description | Fondcare Sdn Bhd |
Project Owner | Fondcare Sdn Bhd |
Completion Date | Nov 11 |
Project 118
Project Description | SENG HUAT HANG FOR AMPHENOL TCS SDN BHD |
Project Owner | SENG HUAT HANG |
Completion Date | Jul 11 |
Project 119
Project Description | MEMC IPOH (M) SDN BHD |
Project Owner | MEMC IPOH (M) SDN BHD |
Completion Date | Jul 11 |
Project 120
Project Description | 1ST AVENUE LINK BRIDGE AIR COND & VENTILATION |
Project Owner | Capital Land -1st Avenue |
Completion Date | Jan 11 |
Project 121
Project Description | MEMC -SARAWAK SOLAR WAFER PLANT PROJECT |
Project Owner | MEMC |
Completion Date | Jan 11 |
Project 122
Project Description | MOTOROLA PENANG TO INSTALL ACMV |
Project Owner | MOTOROLA |
Completion Date | Feb 11 |
Project 123
Project Description | BENCHMARK ELECTRONICS (M) SDN BHD |
Project Owner | PENISULAR HO HUP ENGINEERING SDN BHD |
Completion Date | Apr 11 |
Project 124
Project Description | TTE IBIDIN ASCU WORK AT SWITCH ROOM & ANALYST LAB |
Project Owner | IBIDIN |
Completion Date | Feb 11 |
Project 125
Project Description | SOON HUP COOLING TOWER – TO REPLACE INFILL AND COIL AT WISMA SOON HUP SARAWAK |
Project Owner | SOON HUP GROUP |
Completion Date | Mar 11 |
Project 126
Project Description | CHEEKY DUCT RESTAURANT AT STRAITS QUEY PENANG |
Project Owner | CHEEKY DUCT |
Completion Date | 30 Oct 10 |
Project 127
Project Description | MEMC EPI PROJECT PHASE 1 & 2 |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 01 Nov 10 |
Project 128
Project Description | MEMC SUBSTATION – TO SUPPLY & INSTALL 11KV SUB STATION SWITCHROOM |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 27 Dec 10 |
Project 129
Project Description | FIRST SOLAR MODULE 5 & 6 – BMS WIRING WORK FOR FMCS |
Project Owner | FIRST SOLAR |
Completion Date | 30 Dec 10 |
Project 130
Project Description | FLEXTRONICS PI CANTEEN AIR CONDITIONINIG UPGRADE WORK |
Project Owner | FLEXTRONICS |
Completion Date | 30 Nov 10 |
Project 131
Project Description | IAQ MEMC DUCTWORK & AIR CONDITIONING & MECHANICAL INSTALLATION SYSTEM WORK |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 30 Nov 10 |
Project 132
Project Description | MEMC TO INSTALL MECHANICAL WORKS FOR EDGE PROFILER |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 30 Oct 10 |
Project 133
Project Description | MEMC- TO INSTALL HOOK UP FOR 3RD EDGE GRINDER |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 30 Oct 10 |
Project 134
Project Description | MEMC- TO INSTALL NTC TOOL INSTALL HOOK UP |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 30 Oct 10 |
Project 135
Project Description | MEMC- TO INSTALL LOW TEMPERATURE PROCESS COOLING |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 30 Oct 10 |
Project 136
Project Description | MEMC PRODUCTION – TO INSTALL OF PVE SCH 80 & GI EXHAUST DUCT FOR CHEMICAL CABINET AT PRODUCTION AREA |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 30 Oct 10 |
Project 137
Project Description | St Jude connection – Process Utilities |
Project Owner | St Jude Medical Inc |
Completion Date | 01 Aug 10 |
Project 138
Project Description | Carsem AHU M Site -HVAC System |
Project Owner | CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak |
Completion Date | 01 Sep 10 |
Project 139
Project Description | NGC Garter – HVAC & Process Utiulities |
Project Owner | NGC Garter |
Completion Date | 01 Jun 10 |
Project 140
Project Description | MEMC GI Gutter |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | 01 Jun 10 |
Project 141
Project Description | ST Jude Medical -Process Utilities |
Project Owner | St Jude Medical Inc |
Completion Date | 12 Feb 2010 |
Project 142
Project Description | ST Jude Medical -HVAC |
Project Owner | St Jude Medical Inc |
Completion Date | 12 Feb 2010 |
Project 143
Project Description | TTEIbidin VRV at Penang Sains Park – VRV system |
Project Owner | IBIDIN |
Completion Date | Dec 2009 |
Project 144
Project Description | MEMC IPOH SDN BHD -HVAC & Air cond system |
Project Owner | MEMC IPOH SDN BHD |
Completion Date | July 2009 |
Project 145
Project Description | OCBC -PENANG & BUTTERWORTH -Air Cond system |
Project Owner | JURUSTRAJAYA SDN BHD Lot 39B, Batu 5, Jalan Ampang 68000 Ampang Selangor |
Completion Date | March 2008 |
Project 146
Project Description | PENTAMASTER TECHNOLOGY SDN BHD -HVAC system |
Project Owner | PENTAMASTER |
Completion Date | "Dec 2008 |
Project 147
Project Description | NADI PERKESO -ALOR SETAR -HVAC System |
Project Owner | PERKESO |
Completion Date | Dec 2008 |
Project 148
Project Description | MOTOROLA PENANG -HVAC System |
Project Owner | MOTOROLA |
Completion Date | Dec 2008 |
Project 149
Project Description | FIRST SOLAR BMS SYSTEM – MODULE 2 |
Project Owner | FIRST SOLAR |
Completion Date | June 2008 |
Project 150
Project Description | PETRONAS SEGAMAT (COMP STATION EXTENSION)-HVAC & Ventilation System |
Project Owner | PETRONAS |
Completion Date | Dec 2008 |
Project 151
Project Description | SUBANG AVENUE -SHOPPING CENTER -SELANGOR-HVAC & Mechanical System |
Project Owner | BRUNDSFIELD |
Completion Date | June 2009 |
Project 152
Project Description | NS COOLING TOWER OFFICE PRAI- HVAC system |
Project Owner | NS |
Completion Date | Nov 2008 |
Project 153
Project Description | FIRST SOLAR BMS SYSTEM – MODULE 3&4 |
Project Owner | FIRST SOLAR |
Completion Date | Dec 2008 |
Project 154
Project Description | MUTIARA PARADE PENANG-HVAC & Mechnical System |
Project Owner | LION MUTIARA |
Completion Date | March 2010 |
Project 155
Project Description | DELL PACIFIC – CHILLER REPLACEMENT |
Project Owner | DELL |
Completion Date | Jan 2009 |
Project 156
Project Description | PERTUBUHAN KESELAMATAN SOSIAL (PERKESO) KEDAH-HVAC & Mechanical system |
Project Owner | PERKESO |
Completion Date | 12 Nov 2008 |
Project 157
Project Description | CYGAL PROPERTIES-HVAC System |
Project Owner | CYGAL PROPERTIES |
Completion Date | Dec 2009 |
Project 158
Project Description | PETRONAS KUANTAN (COMP STATION EXTENSION)-HVAC System |
Project Owner | PETRONAS |
Completion Date | Jan 2008 |
Project 159
Project Description | PRESIDE ENGINEERING SDN BHD -UNTUK MEMBINA 1 BLOCK KILANG DENGAN 2 TINGKAT PEJABAT DI ATAS PLOT 216 9(B) TAMAN PERINDUSTRIAN BUKIT MINYAK 13 SEBERANG PERAAI TENGAH FOR AIR COND SYSTEM -HVAC System |
Project Owner | PRESIDE ENGINEERING SDN BHD 45&42a, Kuantan Road 10150 Penang |
Completion Date | Dec 2007 |
Project 160
Project Description | CARSEM (S) & (M)SDN BHD – PTTC OFFICE-HVAC System |
Project Owner | CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak |
Completion Date | March 2008 |
Project 161
Project Description | JABIL CIRCUIT NEW AUDITORIUM-HVAC System |
Project Owner | JABIL CIRCUIT |
Completion Date | 31 August 2007 |
Project 162
Project Description | BAYAN JAYA PENANG -HVAC & Mechanical |
Project Owner | BAYAN JAYA |
Completion Date | Dec 2009 |
Project 163
Project Description | ORYX ADVANCED SDN BHD PENANG-HVAC & Ventilation System |
Project Owner | ORYX ADVANCED |
Completion Date | July 2008 |
Project 164
Project Description | FIRST SOLAR BMS SYSTEM – MODULE 1 |
Project Owner | FIRST SOLAR |
Completion Date | March 2008 |
Project 165
Project Description | MULTI NATIONAL COMPANY -PG7 TECHNICAL LAB -HVAC & Hook Up |
Project Owner | MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Completion Date | 11 Nov 2006 |
Project 166
Project Description | MULTINATIONAL COMPANY KM1 TIGC Q306 & Q207 -Hook Up |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | 12 June 2007 |
Project 167
Project Description | MULTI NATIONAL COMPANY -Q4 05 PROGRESSIVE BUILD AT KM2 – Hook Up |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | 31 Oct 2006 |
Project 168
Project Description | MULTI NATIONAL COMPANY Q305 PROGRESSIVE BUILD AT PG8 & KM1 – Hook Up |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | 30 Sept 2006 |
Project 169
Project Description | PENTAMASTER TECHNOLOGY (M) SDN BHD- Hvac & Mechanical |
Project Owner | PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang |
Completion Date | 30 May 2005 |
Project 170
Project Description | MULTI NATIONAL COMPANY – PG7 7 FOL -Hook Up |
Project Owner | MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Completion Date | 23 Dec 2005 |
Project 171
Project Description | MULTI NATIONAL COMPANY – PG8 BCR -Hook Up |
Project Owner | MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Completion Date | 26 August 2005 |
Project 172
Project Description | MALAYSIAN BUDDHIST ASSOCIATION – HVAC & Mechanical |
Project Owner | MALAYSIA BUDDHIST ASSOCIATION JLN BURMAH PENANG |
Completion Date | 23 May 2005 |
Project 173
Project Description | MULTI NATIONAL COMPANY – KM3 -HVAC & Mechanical |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | 31 Mar 06 |
Project 174
Project Description | MULTI NATIONAL COMPANY – KM1 CMT 29-42 -Hvac & Mechanical |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | 20 June 2005 |
Project 175
Project Description | HFB LASER TECH (M) SDN BHD- Hvac & Mechanical |
Project Owner | HFB LASER TECH (M) SDN BHD |
Completion Date | 30 April 2005 |
Project 176
Project Description | Apex Properties -Air cond & Ventilation Systems- |
Project Owner | Apec Properties Sdn Bhd Plot 74 , Kawasan Perusahaan Bukit Tengah Mukim 11 Seberang Jaya Perai Tengah |
Completion Date | 28 Feb 2004 |
Project 177
Project Description | GUYNEY PLAZA Office Renovation work For Hvac & Mechanical |
Project Owner | Gurnay Plaza Sdn Bhd 170-06-01 Plaza Gurney persiaran Gurney 10250 Penang |
Completion Date | 15 Nov 2004 |
Project 178
Project Description | Widetech HVAC & Widetech Process System – HVAC & Process system |
Project Owner | Widetech Manufacturing Sdn Bhd Factory At Bayan Lepas Industrial Estate Mk 12.D.B.D Phase 4 Penang |
Completion Date | 31 Mar 2004 |
Project 179
Project Description | Pentamaster Factory Extention HVAC system |
Project Owner | PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang |
Completion Date | 29 Feb 2004 |
Project 180
Project Description | Parti Gerkana Rakyat Malaysia -Air conditioning & mechanical Ventilation System |
Project Owner | Parti Gerakan Rakyat Malaysia No1 , 139 jalan Macalister Di Atas Lot 9 1312 Dan 1340 Sek 12, Bandar Georgetown |
Completion Date | Dec 03 |
Project 181
Project Description | Multinational Companyy -Pg12 NPG Lab +_ ATD Lab -Hook Up |
Project Owner | Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam |
Completion Date | Sept 03 |
Project 182
Project Description | Multi National Company – Km1 Q4-02 Progressive Build -Hook Up |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | July 03 |
Project 183
Project Description | Multi National Company -Pg8 Combined Project -Hook Up |
Project Owner | MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Completion Date | Sept 03 |
Project 184
Project Description | Compressor Assembly for Trane chiller No 2 |
Project Owner | Mega Express Air Conditioning Sdn Bhd 737-3-8 Sri Sungai Nibong Complex Jalan Sultan Azlan Shah b ayan Lepas Penang |
Completion Date | July 03 |
Project 185
Project Description | MNC-KM1/Pg7 & PG8 Mechanical Exhaust System Upgrading |
Project Owner | MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG |
Completion Date | July 2003 |
Project 186
Project Description | PCC -Installation Air cond & Exhaust System of Penang Christian Center At jalan Khaw Sim Bee |
Project Owner | PENANG CHRISTIAN CENTER |
Completion Date | Jan 2004 |
Project 187
Project Description | B & W Food Products Sdn Bhd -Hvac & Mechanical |
Project Owner | B&W Food Products Sdn Bhd 4765 Lorong Permatang Pauh 13400 Butterworth |
Completion Date | Sept 2002 |
Project 188
Project Description | MNC , Supply , Installation ,Delivery to Site T&C HVAC ducting , Piping & Utilities Work |
Project Owner | Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam |
Completion Date | April 2002 |
Project 189
Project Description | MNC Company Km1 FCPGA Phase 2 General Contractor Package |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | Jan 2002 |
Project 190
Project Description | IClarm The World Fish Center -Headquarter Renovation Project |
Project Owner | International Center For Living Aquatics Resources Management -Jalan Batu Maung 11960 Bayan Lepas Penang |
Completion Date | July 2001 |
Project 191
Project Description | ASIA Composite MFG -Hvac & Mechanical Package |
Project Owner | ASIA COMPOSITE MFG |
Completion Date | Feb 2001 |
Project 192
Project Description | SITT TATT Industrial Gases – Wafer Tech At Kulim Hi Tech |
Project Owner | WAFER TECH |
Completion Date | Dec 2000 |
Project 193
Project Description | Wafer Technology – Kulim Hi tech Park – Hvac & Mechanical Package |
Project Owner | WAFER TECH |
Completion Date | Julai 2000 |
Project 194
Project Description | MNC – FCPGA PPV/Tester Expansion |
Project Owner | MNC Plot 8-12 & 39 Phase1 Kulim Hi Tech Park 09000 Kulim |
Completion Date | October 2000 |
Project 195
Project Description | Applied Materials – Fit Out Work @ KHTP |
Project Owner | Bovis (M) Sdn Bhd Level 11, tower 1 MNI Twins 11 Jalan Pinang 50450 Kuala Lumpur |
Completion Date | Julai 2000 |
Project 196
Project Description | Federal Express -Air Cond & Ventilation System |
Project Owner | Iviron (M) Sdn Bhd 68-B Jalan Masjid Negeri 11600 Pulau Pinang |
Completion Date | April 2000 |
Project 197
Project Description | IP Softcom (M) Sddn Bhd -Air Cond & Ventilation system |
Project Owner | MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang |
Completion Date | March 2000 |
Project 198
Project Description | Muti National Company -KM1 Phase 3 -FCPGA -Hook UP |
Project Owner | MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH |
Completion Date | march 2000 |
Project 199
Project Description | Multi National Company KM1 -Retrofit -HVAC & Mechanical Package . |
Project Owner | MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang |
Completion Date | Mei 1999 |
Project 200
Project Description | QT HIGHTECH MALAYSIA SDN BHD |
Project Owner | QT Hightech Malaysia Sdn Bhd |
Completion Date | March 2012 |
Project 201
Project Description | Infineon Kulim |
Project Owner | INFINEON TECHNOLOGIES (KULIM SDN BHD) |
Completion Date | March 2012 |
Project 202
Project Description | Carsem (M Site) Sdn Bhd |
Project Owner | CARSEM (M SITE) SDN BHD |
Completion Date | March 2012 |
Project 203
Project Description | Gleneagles Medical Center Penang 1 Block 19 Storey Clinic & Wards With Carpark |
Project Owner | GLENEAGLES MEDICAL GROUP |
Completion Date | March 2012 |
Project 204
Project Description | Aman Central Shopping Mall at Alor Setar |
Project Owner | Great Reality Sdn Bhd |
Scope Of Work | Smoke Spill fan, make-up fresh air ductwork control panel & smoke control system at Aman Central Alor Setar |
Start Date | 1-Jun-2014 |
Completion Date | 31 March 2015 |
Project 205
Project Description | First Solar BMS Wiring |
Project Owner | First Solar |
Scope Of Work | BMS Wiring works & control valves for First Solar KLM 1.5 Expansion Works |
Start Date | 1-Feb-2014 |
Completion Date | Jul 2014 |
Project 206
Project Description | WD Clean room system installation |
Project Owner | Western Digita Sdn |
Scope Of Work | PN1MA17 / 18 clean room modification mechanical,electrical services and architecture |
Start Date | 1-Mar-2014 |
Completion Date | Jul 2015 |
Project 207
Project Description | Aman Central Shopping Mall at Alor Setar |
Project Owner | Great Reality Sdn Bhd |
Scope Of Work | Mechanical Ventilation of HVAC services installation |
Start Date | 30-Oct-13 |
Completion Date | 31-Mar-15 |
Project 208
Project Description | Mydin Kompleks Perniagaan 3 Tingkat (Parit Buntar Perak) |
Project Owner | Simbol Teguh Sdn Bhd |
Scope Of Work | Mechanical Ventilation of HVAC services installation |
Start Date | 15-Jun-13 |
Completion Date | 30-Nov-14 |