• 2011 Bakun Hydroelectric Project, CW2 Package located at Sarawak Malaysia Project Own by Sarawak Hidro Sdn Bhd
  • 2010 1st Avenue Mall Penang Project own by 1st Avenue Mall Sdn Bhd
  • 2009 St Jude Medical-HVAC & Process Utilities Project own by St Jude Medical Inc
  • 2004 Penang Christian Center
  • 2003 Penang Buddhist Association

Current Project

Project 1

Project Description
Oryx Advance Material Phase 4 Mechanical Services work -GA & HIP 2 area
Project Owner
LB Brothers Sdn Bhd
Scope Of Work
HVAC Air Conditioning System
Start Date
Aug 2016
Completion Date
March 2017

Project 2

Project Description
Infineon kulim Hi Tech Park – To Service Air Conditioning & heating system
Project Owner
Infineon (M) Sdn Bhd
Scope Of Work
HVAC Air Conditioning & Ventilation System
Start Date
Feb 2016
Completion Date
Oct 2016

Project 3

Project Description
Alora Hotel Asthetik Property Group Sdn Bhd -Air Conditioning & Ventilation System
Project Owner
Asthetik Property Group Sdn Bhd
Scope Of Work
HVAC Air Conditioning & Ventilation System
Start Date
Nov 2015
Completion Date
Dec 2016

Project 4

Project Description
Monthly Maintenace for integrated air cond system for Badan pengurusan Bersama Island Plaza
Project Owner
Island Plaza Group (Penang)
Scope Of Work
HVAC Air Conditioning & Ventilation System
Start Date
Jun 2016
Completion Date
May 2018

Project 5

Project Description
Monthly maintenace for integrated air cond systmem at Aman Central Mall Alor Setar Kedah
Project Owner
Great Realty Sdn Bhd
Scope Of Work
HVAC Air Conditioning & Ventilation System
Start Date
Oct 2015
Completion Date
Sept 2017

Completed Project

Project 1

Project Description
Penang Free School ACSU system installation
Project Owner
Penang Free School
Scope Of Work
Installation of ACSU system
Completion Date
June 2014

Project 2

Project Description
CLHS Air Itam( Additional 1 new blok of 5 Story) Tambahan 27 No Bilik Darjah
Project Owner
CLHS (Private)
Scope Of Work
Supply, Delivery, installation, testing & Commissioning of the Mechanical & Electrical Services installation
Completion Date
31 Mar 2012

Project 3

Project Description
FIRST SOLAR BMS SYSTEM FOR FS M1 TO 6 EXPANSIONS
Project Owner
FIRST SOLAR
Scope Of Work
Installation of BMS wiring works for FS M1 to 6 Expansion Works
Completion Date
30 Oct 2013

Project 4

Project Description
UMW Toyota
Project Owner
UMW Toyota
Scope Of Work
UMW Toyota, Prai – To dismantle existing 5 slot linear diffuser and plenum bos
Completion Date
Jul 2012

Project 5

Project Description
Auxpoint Industries Sdn Bhd
Project Owner
Seng Huat Hang Sdn Bhd
Scope Of Work
To modification existing air-cond ductwork and install new generator set & smoke spill fans system at Seng Huat Hang Sdn Bhd
Completion Date
31 August 2013

Project 6

Project Description
5NPV (M) SDN BHD
Project Owner
5NPV (M) SDN BHD
Scope Of Work
Packaging works at KLM1.5 equipment
Completion Date
30 Jul 2013

Project 7

Project Description
5NPV (M) SDN BHD
Project Owner
5NPV (M) SDN BHD
Scope Of Work
Dismantling works at KLM1.5 equipment
Completion Date
30 Jul 2013

Project 8

Project Description
Motorola Solution Sdn Bhd (HVAC)
Project Owner
Motorola Solution Sdn Bhd
Scope Of Work
To setup battery line at Depo (Mechanical)
Completion Date
1-May-2013

Project 9

Project Description
CARL CORRYNTON MEDICAL CENTRE
Project Owner
Carl Carrynton Medical Centre
Scope Of Work
TMC-ACMV works for L2 OT lab and recovery area installation
Completion Date
May 2013

Project 10

Project Description
CARL CORRYNTON MEDICAL CENTRE
Project Owner
Carl Carrynton Medical Centre
Scope Of Work
Installation of refrigerant piping,wiring,control panel for air cooled split units(410A) at Level1 & Level4 for Carl Corrynton Medical Centre
Completion Date
May 2013

Project 11

Project Description
SUNWAY HOTEL SEBERANG JAYA
Project Owner
SUNWAY REIT MANAGEMENT SDN BHD
Scope Of Work
Refurbishment works for Sunway Hotel Seberang Jaya (Supply, Delivery, Installation, Testing & Commissioning of Air conditioning & Mechanical Ventilation(ACMV) Services for Coffee house and Lobby at Ground Floor
Completion Date
31 March 2013

Project 12

Project Description
MEMC IPOH SDN BHD (MECHANICAL WORK)
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
General contractor for mechanical work for Supply and Installation of Air Compressor, Chilled water pipe & Process Vacuum System
Completion Date
Feb 2013

Project 13

Project Description
SIMFONI BISTARI SDN BHD
Project Owner
SIMFONI BISTARI SDN BHD
Scope Of Work
Simfoni Bistari Sdn Bhd – Air Conditioning & Mechanical Installation Services
Completion Date
13 June 2013

Project 14

Project Description
SUNWAY HOTEL SEBERANG JAYA
Project Owner
SUNWAY REIT MANAGEMENT SDN BHD
Scope Of Work
Refurbishment works for Sunway Hotel Seberang Jaya(Supply, Delivery, Installation, Testing & Commissioning of Air conditioning & Mechanical Ventilation(ACMV) Services for Guest Room from level 3-5
Completion Date
April 2013

Project 15

Project Description
5NPV (M) SDN BHD (Hook up)
Project Owner
5NPV (M) SDN BHD
Scope Of Work
Mengubahsuai dalaman kilang sediada 1 tingkat dengan lantai mezanin di atas Lot PT25 (HSD41740), Jalan Hi-Tech 4, Kulim Hi-Tech Park, Kulim
Completion Date
Sept 2012

Project 16

Project Description
Motorola Solution Sdn Bhd (HVAC)
Project Owner
Motorola Solution Sdn Bhd
Scope Of Work
Class 100 Cleanroom services installation
Completion Date
Nov 2012

Project 17

Project Description
5NPV (M) SDN BHD (HVAC Mechanical)
Project Owner
5 NPV (M) SDN BHD
Scope Of Work
Mengubahsuai dalaman kilang sediada 1 tingkat dengan lantai mezanin di atas Lot PT25 (HSD41740), Jalan Hi-Tech 4, Kulim Hi-Tech Park, Kulim
Completion Date
Sept 2012

Project 18

Project Description
MEMC IPOH SDN BHD
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
Mechanical contractor for CDA interlink
Completion Date
Jul-12

Project 19

Project Description
GLENEAGLES MEDICAL CENTER PENANG 1 BLOCK 19 STOREY CLINIC & WARDS WITH CARPARK
Project Owner
GLENEAGLES MEDICAL GROUP
Scope Of Work
HVAC system
Completion Date
Aug-12

Project 20

Project Description
Ideal Property -Build In Wiring & Air cond pipe system
Project Owner
IDEAL PROPERTY DEVELOPMENT SDN BHD
Scope Of Work
HVAC system
Completion Date
Aug-2012

Project 21

Project Description
BAKUN HYDROLIC POWER PLANT SARAWAK
Project Owner
SARAWAK HYDRO SDN BHD
Scope Of Work
HVAC system
Completion Date
March ,2012

Project 22

Project Description
Infineon Kulim
Project Owner
Infineon Technologies (Kulim Sdn Bhd)
Scope Of Work
To Supply and Install Process Water Pump 260K
Completion Date
Mar 2012

Project 23

Project Description
MEMC Green Wax
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
To Install Green wax building
Completion Date
Jun-12

Project 24

Project Description
Hamadatec at Kulim
Project Owner
Hamadatec Sdn Bhd
Scope Of Work
To supply and install cooling water system
Completion Date
Mar-12

Project 25

Project Description
1st Avenue shopping mall Cinemas – ACMV services
Project Owner
Capital Land – 1st Avenue
Scope Of Work
HVAC system
Completion Date
October,2010

Project 26

Project Description
PARAMOUNT INTERNATIONAL SCHOOL -PENANG
Project Owner
PARAMOUNT
Scope Of Work
HVAC system
Completion Date
Dec-11

Project 27

Project Description
VESTECH PMU AIR COND SYSTEM AT SG PINANG PENANG
Project Owner
TNB NASIONAL BERHAD
Scope Of Work
HVAC system
Completion Date
Feb-11

Project 28

Project Description
MEMC Wire Saw
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
E500 Wire Saw (No10) tools installation at Slicing and lapping area
Completion Date
Nov-11

Project 29

Project Description
Fondcare Sdn Bhd
Project Owner
Fondcare Sdn Bhd
Scope Of Work
To supply and install air condunits at TENDY International School at Penang
Completion Date
Nov-11

Project 30

Project Description
SENG HUAT HANG FOR AMPHENOL TCS SDN BHD
Project Owner
SENG HUAT HANG
Scope Of Work
Retrofit work for ACMV
Completion Date
Jul-11

Project 31

Project Description
MEMC IPOH (M) SDN BHD
Project Owner
SENG HUAT HANG
Scope Of Work
TODEOILER, EXPOXYREMOVER, EDGEREMOVER, EDGEPROFILER 6 & 7 TOOLS HOOK UP WORKS AT CLEAN ROOM
Completion Date
Jul-11

Project 32

Project Description
1ST AVENUE LINK BRIDGE AIR COND & VENTILATION
Project Owner
Capital Land -1st Avenue
Scope Of Work
HVAC & VENTILATION
Completion Date
Jan-11

Project 33

Project Description
MEMC -SARAWAK SOLAR WAFER PLANT PROJECT
Project Owner
MEMC
Scope Of Work
BMS system
Completion Date
January,2011

Project 34

Project Description
MOTOROLA PENANG TO INSTALL ACMV
Project Owner
MOTOROLA
Scope Of Work
HVAC system
Completion Date
Feb-11

Project 35

Project Description
BENCHMARK ELECTRONICS (M) SDN BHD
Project Owner
PENISULAR HO HUP ENGINEERING SDN BHD
Scope Of Work
HVAC system
Completion Date
Apr-11

Project 36

Project Description
TTE IBIDIN ASCU WORK AT SWITCH ROOM & ANALYST LAB
Project Owner
IBIDIN
Scope Of Work
HVAC system
Completion Date
Feb-11

Project 37

Project Description
SOON HUP COOLING TOWER – TO REPLACE INFILL AND COIL AT WISMA SOON HUP SARAWAK
Project Owner
SOON HUP GROUP
Scope Of Work
COOLING TOWER
Completion Date
Mar-11

Project 38

Project Description
CHEEKY DUCT RESTAURANT AT STRAITS QUEY PENANG
Project Owner
CHEEKY DUCT
Scope Of Work
TO INSTALL OF KITCHEN EXHAUST SYSTEM FOR CHEEKY DUCT ASIAN RESTAURANT
Completion Date
30-Oct-10

Project 39

Project Description
MEMC EPI PROJECT PHASE 1 & 2
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
BMS SYSTEM
Completion Date
01-Nov-10

Project 40

Project Description
MEMC SUBSTATION – TO SUPPLY & INSTALL 11KV SUBSTATION SWITCHROOM
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
ELECTRICAL AND MEP
Completion Date
27-Dec-10

Project 41

Project Description
FIRST SOLAR MODULE 5 & 6-BMS WIRING WORK FOR FMCS
Project Owner
FIRST SOLAR
Scope Of Work
BMS SYSTEM
Completion Date
30-Dec-10

Project 42

Project Description
FLEXTRONICS PI CANTEEN AIR CONDITIONINIG UPGRADE WORK
Project Owner
FLEXTRONICS
Scope Of Work
HVAC SYSTEM
Completion Date
30-Nov-10

Project 43

Project Description
IAQ MEMC DUCTWORK & AIRCONDITIONING & MECHANICAL INSTALLATION SYSTEM WORK
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
HVAC SYSTEM
Completion Date
30-Nov-10

Project 44

Project Description
MEMC- TO INSTALL HOOK UP FOR 3RD EDGE GRINDER
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
HOOK UP
Completion Date
30-Oct-10

Project 45

Project Description
MEMC- TO INSTALL NTC TOOL INSTALL HOOK UP
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
HOOK UP
Completion Date
30-Oct-10

Project 46

Project Description
St Jude connection – Process Utilities
Project Owner
St Jude Medical Inc
Scope Of Work
Mechanical process sytem
Completion Date
01-Aug-10

Project 47

Project Description
Carsem AHU M Site -HVAC System
Project Owner
CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak
Scope Of Work
HVAC system
Completion Date
01-Sep-10

Project 48

Project Description
NGC Garter – HVAC & Process Utiulities
Project Owner
NGC Garter
Scope Of Work
HVAC and Mechanical process system
Completion Date
01-Jun-10

Project 49

Project Description
MEMC GI Gutter
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
CSA
Completion Date
01-Jun-10

Project 50

Project Description
ST Jude Medical -Process Utilities
Project Owner
St Jude Medical Inc
Scope Of Work
Mechanical process sytem
Completion Date
12 Feb 2010

Project 51

Project Description
ST Jude Medical -HVAC
Project Owner
St Jude Medical Inc
Scope Of Work
HVAC system
Completion Date
12 Feb 2010

Project 51

Project Description
ST Jude Medical -HVAC
Project Owner
St Jude Medical Inc
Scope Of Work
HVAC system
Completion Date
12 Feb 2010

Project 52

Project Description
TTEIbidin VRV at Penang Sains Park – VRV system
Project Owner
IBIDIN
Scope Of Work
VRV system
Completion Date
Dec 2009

Project 53

Project Description
MEMC IPOH SDN BHD -HVAC & Air cond system
Project Owner
MEMC IPOH SDN BHD
Scope Of Work
HVAC system
Completion Date
July 2009

Project 54

Project Description
OCBC -PENANG & BUTTERWORTH – Air Cond system
Project Owner
JURUSTRAJAYA SDN BHD Lot 39B, Batu 5, Jalan Ampang 68000 Ampang Selangor
Scope Of Work
HVAC system
Completion Date
March 2008

Project 55

Project Description
PENTAMASTER TECHNOLOGY SDN BHD -HVAC system
Project Owner
PENTAMASTER
Scope Of Work
HVAC system
Completion Date
Dec 2008

Project 56

Project Description
NADI PERKESO -ALOR SETAR -HVAC System
Project Owner
PERKESO
Scope Of Work
HVAC system
Completion Date
Dec 2008

Project 57

Project Description
MOTOROLA PENANG -HVAC System
Project Owner
MOTOROLA
Scope Of Work
HVAC system
Completion Date
Dec 2008

Project 58

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 2
Project Owner
FIRST SOLAR
Scope Of Work
BMS system
Completion Date
June 2008

Project 59

Project Description
PETRONAS SEGAMAT (COMP STATION EXTENSION)- HVAC & Ventilation System
Project Owner
PETRONAS
Scope Of Work
HVAC system
Completion Date
Dec 2008

Project 60

Project Description
SUBANG AVENUE – SHOPPING CENTER – SELANGOR – HVAC & Mechanical System
Project Owner
BRUNDSFIELD
Scope Of Work
HVAC system
Completion Date
June 2009

Project 61

Project Description
NS COOLING TOWER OFFICE PRAI – HVAC system
Project Owner
NS
Scope Of Work
HVAC system
Completion Date
Nov 2008

Project 62

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 3 & 4
Project Owner
FIRST SOLAR
Scope Of Work
BMS system
Completion Date
Dec 2008

Project 63

Project Description
MUTIARA PARADE PENANG-HVAC & Mechnical System
Project Owner
LION MUTIARA
Scope Of Work
HVAC system
Completion Date
March 2010

Project 64

Project Description
DELL PACIFIC – CHILLER REPLACEMENT
Project Owner
DELL
Scope Of Work
HVAC system
Completion Date
Jan 2009

Project 65

Project Description
PERTUBUHAN KESELAMATAN SOSIAL (PERKESO) KEDAH – HVAC & Mechanical system
Project Owner
PERKESO
Scope Of Work
HVAC system
Completion Date
12 Nov 2008

Project 66

Project Description
CYGAL PROPERTIES-HVAC System
Project Owner
CYGAL PROPERTIES
Scope Of Work
HVAC system
Completion Date
Dec 2009

Project 67

Project Description
PETRONAS KUANTAN (COMP STATION EXTENSION) – HVACSystem
Project Owner
PETRONAS
Scope Of Work
HVAC system
Completion Date
Jan 2008

Project 68

Project Description
PRESIDE ENGINEERING SDN BHD – UNTUK MEMBINA 1 BLOCK KILANG DENGAN 2 TINGKAT PEJABAT DI ATAS PLOT 216 9(B) TAMAN PERINDUSTRIAN BUKIT MINYAK 13 SEBERANG PERAAI TENGAH FOR AIR COND SYSTEM – HVAC System
Project Owner
PRESIDE ENGINEERING SDN BHD 45 & 42a, Kuantan Road 10150 Penang
Scope Of Work
HVAC system
Completion Date
39,306.00

Project 69

Project Description
CARSEM (S) & (M)SDN BHD – PTTC OFFICE-HVAC System
Project Owner
CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak
Scope Of Work
HVAC system
Completion Date
March 2008

Project 70

Project Description
JABIL CIRCUIT NEW AUDITORIUM-HVAC System
Project Owner
JABIL CIRCUIT
Scope Of Work
HVAC system
Completion Date
31 August 2007

Project 71

Project Description
BAYAN JAYA PENANG -HVAC & Mechanical
Project Owner
BAYAN JAYA
Scope Of Work
HVAC system
Completion Date
Dec 2009

Project 72

Project Description
ORYX ADVANCED SDN BHD PENANG – HVAC & Ventilation System
Project Owner
ORYX ADVANCED
Scope Of Work
HVAC and Mechanical process system
Completion Date
July 2008

Project 73

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 1
Project Owner
FIRST SOLAR
Scope Of Work
BMS system
Completion Date
March 2008

Project 74

Project Description
MULTI NATIONAL COMPANY – PG7 TECHNICAL LAB – HVAC & Hook Up
Project Owner
MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Scope Of Work
HVAC system
Completion Date
11 Nov 2006

Project 75

Project Description
MULTI NATIONAL COMPANY KM1 TIGC Q306 & Q207 – HookUp
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
Tools install project
Completion Date
12 June 2007

Project 76

Project Description
MULTI NATIONAL COMPANY – Q405 PROGRESSIVE BUILD AT KM2 – Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
Tools install project
Completion Date
31 Oct 2006

Project 77

Project Description
MULTI NATIONAL COMPANY Q305 PROGRESSIVE BUILD AT PG8 & KM1 – Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
Tools install project
Completion Date
30 Sept 2006

Project 78

Project Description
PENTAMASTER TECHNOLOGY(M) SDN BHD – Hvac & Mechanical
Project Owner
PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang
Scope Of Work
HVAC system
Completion Date
30 May 2005

Project 79

Project Description
MULTI NATIONAL COMPANY – PG7 7 FOL -Hook Up
Project Owner
MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Scope Of Work
Tools install project
Completion Date
23 Dec 2005

Project 80

Project Description
MULTI NATIONAL COMPANY – PG8 BCR -Hook Up
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Scope Of Work
Tools install project
Completion Date
26 August 2005

Project 81

Project Description
MALAYSIAN BUDDHIST ASSOCIATION – HVAC & Mechanical
Project Owner
MALAYSIA BUDDHIST ASSOCIATION JLN BURMAH PENANG
Scope Of Work
HVAC system
Completion Date
23 May 2005

Project 82

Project Description
MULTI NATIONAL COMPANY – KM3 -HVAC & Mechanical
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
HVAC system
Completion Date
31 Mar 06

Project 83

Project Description
MULTI NATIONAL COMPANY – KM1 CMT 29-42 – Hvac & Mechanical
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
HVAC system
Completion Date
20 June 2005

Project 84

Project Description
HFB LASER TECH (M) SDN BHD- Hvac & Mechanical
Project Owner
HFB LASER TECH (M) SDN BHD
Scope Of Work
HVAC and Mechanical process system
Completion Date
30 April 2005

Project 85

Project Description
Apex Properties -Air cond & Ventilation Systems
Project Owner
Apec Properties Sdn Bhd Plot 74 , Kawasan Perusahaan Bukit Tengah Mukim 11 Seberang Jaya Perai Tengah
Scope Of Work
HVAC system
Completion Date
28 Feb 2004

Project 86

Project Description
GUYNEY PLAZA Office Renovation work For Hvac & Mechanical
Project Owner
Gurnay Plaza Sdn Bhd 170-06-01 Plaza Gurney persiaran Gurney 10250 Penang
Scope Of Work
HVAC system
Completion Date
15 Nov 2004

Project 87

Project Description
Widetech HVAC & Widetech Process System – HVAC & Process system
Project Owner
Widetech Manufacturing Sdn Bhd Factory At Bayan Lepas Industrial Estate Mk 12.D.B.D Phase 4 Penang
Scope Of Work
HVAC and Mechanical process system
Completion Date
38,077.00

Project 88

Project Description
Pentamaster Factory Extention HVAC system
Project Owner
PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang
Scope Of Work
HVAC system
Completion Date
38,046.00

Project 89

Project Description
Parti Gerkana Rakyat Malaysia – Air conditioning & mechanical Ventilation System
Project Owner
Parti Gerakan Rakyat Malaysia No1 , 139 jalan Macalister Di Atas Lot 9 1312 Dan 1340 Sek 12, Bandar Georgetown
Scope Of Work
HVAC system
Completion Date
Dec 03

Project 90

Project Description
Multinational Companyy -Pg12 NPG Lab +_ ATD Lab -Hook Up
Project Owner
Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam
Scope Of Work
Tools install project
Completion Date
Sept 03

Project 91

Project Description
Multi National Company – Km1 Q4-02 Progressive Build – Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
Tools install project
Completion Date
July 03

Project 92

Project Description
Multi National Company -Pg8 Combined Project -Hook Up
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Scope Of Work
Tools install project
Completion Date
Sept 03

Project 93

Project Description
Compressor Assembly for Trane chiller No 2
Project Owner
Mega Express Air Conditioning Sdn Bhd 737-3-8 Sri Sungai Nibong Complex Jalan Sultan Azlan Shah b ayan Lepas Penang
Scope Of Work
HVAC system
Completion Date
July 03

Project 94

Project Description
MNC-KM1/Pg7 & PG8 Mechanical Exhaust System Upgrading
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Scope Of Work
HVAC system
Completion Date
July 2003

Project 95

Project Description
PCC-Installation Air cond & Exhaust System of Penang Christian Center At jalan Khaw Sim Bee
Project Owner
PENANG CHRISTIAN CENTER
Scope Of Work
HVAC system
Completion Date
Jan 2004

Project 96

Project Description
B & W Food Products Sdn Bhd -Hvac & Mechanical
Project Owner
B&W Food Products Sdn Bhd 4765 Lorong Permatang Pauh 13400 Butterworth
Scope Of Work
HVAC system
Completion Date
Sept 2002

Project 97

Project Description
MNC, Supply, Installation, Delivery to Site T&C HVAC ducting, Piping & Utilities Work
Project Owner
Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam
Scope Of Work
HVAC system
Completion Date
April 2002

Project 98

Project Description
MNC Company Km1 FCPGA Phase 2 General Contractor Package
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
General contractor
Completion Date
Jan 2002

Project 99

Project Description
IClarm The World Fish Center -Headquarter Renovation Project
Project Owner
International Center For Living Aquatics Resources Management -Jalan Batu Maung 11960 Bayan Lepas Penang
Scope Of Work
HVAC system
Completion Date
July 2001

Project 100

Project Description
ASIA Composite MFG -Hvac & Mechanical Package
Project Owner
ASIA COMPOSITE MFG
Scope Of Work
HVAC system
Completion Date
Feb 2001

Project 101

Project Description
SITT TATT Industrial Gases – Wafer Tech At Kulim Hi Tech
Project Owner
WAFER TECH
Scope Of Work
HVAC system
Completion Date
Dec 2000

Project 102

Project Description
Wafer Technology – Kulim Hitech Park – Hvac & Mechanical Package
Project Owner
WAFER TECH
Scope Of Work
HVAC system
Completion Date
July 2000

Project 103

Project Description
MNC – FCPGA PPV/Tester Expansion
Project Owner
MNC Plot 8-12 & 39 Phase1 Kulim Hi Tech Park 09000 Kulim
Scope Of Work
General contractor
Completion Date
October 2000

Project 104

Project Description
Applied Materials – Fit Out Work @ KHTP
Project Owner
Bovis (M) Sdn Bhd Level 11, tower 1 MNI Twins 11 Jalan Pinang 50450 Kuala Lumpur
Scope Of Work
General contractor
Completion Date
July 2000

Project 105

Project Description
Federal Express -Air Cond & Ventilation System
Project Owner
Iviron (M) Sdn Bhd 68-B Jalan Masjid Negeri 11600 Pulau Pinang
Scope Of Work
HVAC system
Completion Date
April 2000

Project 106

Project Description
IP Softcom (M) Sddn Bhd -Air Cond & Ventilation system
Project Owner
MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang
Scope Of Work
HVAC system
Completion Date
March 2000

Project 107

Project Description
Muti National Company -KM1 Phase 3 -FCPGA -Hook UP
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Scope Of Work
Tools install project
Completion Date
March 2000

Project 108

Project Description
Multi National Company KM1 – Retrofit – HVAC & Mechanical Package
Project Owner
MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang
Scope Of Work
HVAC system
Completion Date
Mei 1999

Project 109

Project Description
Hamadatec at Kulim
Project Owner
Hamadatec Sdn Bhd
Completion Date
Dec 11

Project 110

Project Description
Ideal Property -Build In Wiring & Air Cond Pipe System
Project Owner
Ideal Property Development Sdn Bhd
Completion Date
December 2011

Project 111

Project Description
BAKUN HYDROLIC POWER PLANT SARAWAK
Project Owner
SARAWAK HYDRO SDN BHD
Completion Date
March 2011

Project 112

Project Description
Mr Ong Peng Chor 3 Storey bungalow House – To supply and installl VRF system installation work at Tanjung Pinang
Project Owner
Mr Ong Peng Chor
Completion Date
November 2010

Project 113

Project Description
1st Avenue shopping mall Cinemas -ACMV services
Project Owner
Capital Land -1st Avenue
Completion Date
October 2010

Project 114

Project Description
PARAMOUNT INTERNATIONAL SCHOOL -PENANG
Project Owner
PARAMOUNT
Completion Date
Dec 11

Project 115

Project Description
VESTECH PMU AIR COND SYSTEM AT SG PINANG PENANG
Project Owner
TNB NASIONAL BERHAD
Completion Date
Feb 11

Project 116

Project Description
MEMC Wire Saw
Project Owner
MEMC IPOH SDN BHD
Completion Date
Nov 11

Project 117

Project Description
Fondcare Sdn Bhd
Project Owner
Fondcare Sdn Bhd
Completion Date
Nov 11

Project 118

Project Description
SENG HUAT HANG FOR AMPHENOL TCS SDN BHD
Project Owner
SENG HUAT HANG
Completion Date
Jul 11

Project 119

Project Description
MEMC IPOH (M) SDN BHD
Project Owner
MEMC IPOH (M) SDN BHD
Completion Date
Jul 11

Project 120

Project Description
1ST AVENUE LINK BRIDGE AIR COND & VENTILATION
Project Owner
Capital Land -1st Avenue
Completion Date
Jan 11

Project 121

Project Description
MEMC -SARAWAK SOLAR WAFER PLANT PROJECT
Project Owner
MEMC
Completion Date
Jan 11

Project 122

Project Description
MOTOROLA PENANG TO INSTALL ACMV
Project Owner
MOTOROLA
Completion Date
Feb 11

Project 123

Project Description
BENCHMARK ELECTRONICS (M) SDN BHD
Project Owner
PENISULAR HO HUP ENGINEERING SDN BHD
Completion Date
Apr 11

Project 124

Project Description
TTE IBIDIN ASCU WORK AT SWITCH ROOM & ANALYST LAB
Project Owner
IBIDIN
Completion Date
Feb 11

Project 125

Project Description
SOON HUP COOLING TOWER – TO REPLACE INFILL AND COIL AT WISMA SOON HUP SARAWAK
Project Owner
SOON HUP GROUP
Completion Date
Mar 11

Project 126

Project Description
CHEEKY DUCT RESTAURANT AT STRAITS QUEY PENANG
Project Owner
CHEEKY DUCT
Completion Date
30 Oct 10

Project 127

Project Description
MEMC EPI PROJECT PHASE 1 & 2
Project Owner
MEMC IPOH SDN BHD
Completion Date
01 Nov 10

Project 128

Project Description
MEMC SUBSTATION – TO SUPPLY & INSTALL 11KV SUB STATION SWITCHROOM
Project Owner
MEMC IPOH SDN BHD
Completion Date
27 Dec 10

Project 129

Project Description
FIRST SOLAR MODULE 5 & 6 – BMS WIRING WORK FOR FMCS
Project Owner
FIRST SOLAR
Completion Date
30 Dec 10

Project 130

Project Description
FLEXTRONICS PI CANTEEN AIR CONDITIONINIG UPGRADE WORK
Project Owner
FLEXTRONICS
Completion Date
30 Nov 10

Project 131

Project Description
IAQ MEMC DUCTWORK & AIR CONDITIONING & MECHANICAL INSTALLATION SYSTEM WORK
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Nov 10

Project 132

Project Description
MEMC TO INSTALL MECHANICAL WORKS FOR EDGE PROFILER
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 133

Project Description
MEMC- TO INSTALL HOOK UP FOR 3RD EDGE GRINDER
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 134

Project Description
MEMC- TO INSTALL NTC TOOL INSTALL HOOK UP
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 135

Project Description
MEMC- TO INSTALL LOW TEMPERATURE PROCESS COOLING
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 136

Project Description
MEMC PRODUCTION – TO INSTALL OF PVE SCH 80 & GI EXHAUST DUCT FOR CHEMICAL CABINET AT PRODUCTION AREA
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 137

Project Description
St Jude connection – Process Utilities
Project Owner
St Jude Medical Inc
Completion Date
01 Aug 10

Project 138

Project Description
Carsem AHU M Site -HVAC System
Project Owner
CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak
Completion Date
01 Sep 10

Project 139

Project Description
NGC Garter – HVAC & Process Utiulities
Project Owner
NGC Garter
Completion Date
01 Jun 10

Project 140

Project Description
MEMC GI Gutter
Project Owner
MEMC IPOH SDN BHD
Completion Date
01 Jun 10

Project 141

Project Description
ST Jude Medical -Process Utilities
Project Owner
St Jude Medical Inc
Completion Date
12 Feb 2010

Project 142

Project Description
ST Jude Medical -HVAC
Project Owner
St Jude Medical Inc
Completion Date
12 Feb 2010

Project 143

Project Description
TTEIbidin VRV at Penang Sains Park – VRV system
Project Owner
IBIDIN
Completion Date
Dec 2009

Project 144

Project Description
MEMC IPOH SDN BHD -HVAC & Air cond system
Project Owner
MEMC IPOH SDN BHD
Completion Date
July 2009

Project 145

Project Description
OCBC -PENANG & BUTTERWORTH -Air Cond system
Project Owner
JURUSTRAJAYA SDN BHD Lot 39B, Batu 5, Jalan Ampang 68000 Ampang Selangor
Completion Date
March 2008

Project 146

Project Description
PENTAMASTER TECHNOLOGY SDN BHD -HVAC system
Project Owner
PENTAMASTER
Completion Date
"Dec 2008

Project 147

Project Description
NADI PERKESO -ALOR SETAR -HVAC System
Project Owner
PERKESO
Completion Date
Dec 2008

Project 148

Project Description
MOTOROLA PENANG -HVAC System
Project Owner
MOTOROLA
Completion Date
Dec 2008

Project 149

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 2
Project Owner
FIRST SOLAR
Completion Date
June 2008

Project 150

Project Description
PETRONAS SEGAMAT (COMP STATION EXTENSION)-HVAC & Ventilation System
Project Owner
PETRONAS
Completion Date
Dec 2008

Project 151

Project Description
SUBANG AVENUE -SHOPPING CENTER -SELANGOR-HVAC & Mechanical System
Project Owner
BRUNDSFIELD
Completion Date
June 2009

Project 152

Project Description
NS COOLING TOWER OFFICE PRAI- HVAC system
Project Owner
NS
Completion Date
Nov 2008

Project 153

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 3&4
Project Owner
FIRST SOLAR
Completion Date
Dec 2008

Project 154

Project Description
MUTIARA PARADE PENANG-HVAC & Mechnical System
Project Owner
LION MUTIARA
Completion Date
March 2010

Project 155

Project Description
DELL PACIFIC – CHILLER REPLACEMENT
Project Owner
DELL
Completion Date
Jan 2009

Project 156

Project Description
PERTUBUHAN KESELAMATAN SOSIAL (PERKESO) KEDAH-HVAC & Mechanical system
Project Owner
PERKESO
Completion Date
12 Nov 2008

Project 157

Project Description
CYGAL PROPERTIES-HVAC System
Project Owner
CYGAL PROPERTIES
Completion Date
Dec 2009

Project 158

Project Description
PETRONAS KUANTAN (COMP STATION EXTENSION)-HVAC System
Project Owner
PETRONAS
Completion Date
Jan 2008

Project 159

Project Description
PRESIDE ENGINEERING SDN BHD -UNTUK MEMBINA 1 BLOCK KILANG DENGAN 2 TINGKAT PEJABAT DI ATAS PLOT 216 9(B) TAMAN PERINDUSTRIAN BUKIT MINYAK 13 SEBERANG PERAAI TENGAH FOR AIR COND SYSTEM -HVAC System
Project Owner
PRESIDE ENGINEERING SDN BHD 45&42a, Kuantan Road 10150 Penang
Completion Date
Dec 2007

Project 160

Project Description
CARSEM (S) & (M)SDN BHD – PTTC OFFICE-HVAC System
Project Owner
CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak
Completion Date
March 2008

Project 161

Project Description
JABIL CIRCUIT NEW AUDITORIUM-HVAC System
Project Owner
JABIL CIRCUIT
Completion Date
31 August 2007

Project 162

Project Description
BAYAN JAYA PENANG -HVAC & Mechanical
Project Owner
BAYAN JAYA
Completion Date
Dec 2009

Project 163

Project Description
ORYX ADVANCED SDN BHD PENANG-HVAC & Ventilation System
Project Owner
ORYX ADVANCED
Completion Date
July 2008

Project 164

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 1
Project Owner
FIRST SOLAR
Completion Date
March 2008

Project 165

Project Description
MULTI NATIONAL COMPANY -PG7 TECHNICAL LAB -HVAC & Hook Up
Project Owner
MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
11 Nov 2006

Project 166

Project Description
MULTINATIONAL COMPANY KM1 TIGC Q306 & Q207 -Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
12 June 2007

Project 167

Project Description
MULTI NATIONAL COMPANY -Q4 05 PROGRESSIVE BUILD AT KM2 – Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
31 Oct 2006

Project 168

Project Description
MULTI NATIONAL COMPANY Q305 PROGRESSIVE BUILD AT PG8 & KM1 – Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
30 Sept 2006

Project 169

Project Description
PENTAMASTER TECHNOLOGY (M) SDN BHD- Hvac & Mechanical
Project Owner
PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang
Completion Date
30 May 2005

Project 170

Project Description
MULTI NATIONAL COMPANY – PG7 7 FOL -Hook Up
Project Owner
MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
23 Dec 2005

Project 171

Project Description
MULTI NATIONAL COMPANY – PG8 BCR -Hook Up
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
26 August 2005

Project 172

Project Description
MALAYSIAN BUDDHIST ASSOCIATION – HVAC & Mechanical
Project Owner
MALAYSIA BUDDHIST ASSOCIATION JLN BURMAH PENANG
Completion Date
23 May 2005

Project 173

Project Description
MULTI NATIONAL COMPANY – KM3 -HVAC & Mechanical
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
31 Mar 06

Project 174

Project Description
MULTI NATIONAL COMPANY – KM1 CMT 29-42 -Hvac & Mechanical
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
20 June 2005

Project 175

Project Description
HFB LASER TECH (M) SDN BHD- Hvac & Mechanical
Project Owner
HFB LASER TECH (M) SDN BHD
Completion Date
30 April 2005

Project 176

Project Description
Apex Properties -Air cond & Ventilation Systems-
Project Owner
Apec Properties Sdn Bhd Plot 74 , Kawasan Perusahaan Bukit Tengah Mukim 11 Seberang Jaya Perai Tengah
Completion Date
28 Feb 2004

Project 177

Project Description
GUYNEY PLAZA Office Renovation work For Hvac & Mechanical
Project Owner
Gurnay Plaza Sdn Bhd 170-06-01 Plaza Gurney persiaran Gurney 10250 Penang
Completion Date
15 Nov 2004

Project 178

Project Description
Widetech HVAC & Widetech Process System – HVAC & Process system
Project Owner
Widetech Manufacturing Sdn Bhd Factory At Bayan Lepas Industrial Estate Mk 12.D.B.D Phase 4 Penang
Completion Date
31 Mar 2004

Project 179

Project Description
Pentamaster Factory Extention HVAC system
Project Owner
PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang
Completion Date
29 Feb 2004

Project 180

Project Description
Parti Gerkana Rakyat Malaysia -Air conditioning & mechanical Ventilation System
Project Owner
Parti Gerakan Rakyat Malaysia No1 , 139 jalan Macalister Di Atas Lot 9 1312 Dan 1340 Sek 12, Bandar Georgetown
Completion Date
Dec 03

Project 181

Project Description
Multinational Companyy -Pg12 NPG Lab +_ ATD Lab -Hook Up
Project Owner
Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam
Completion Date
Sept 03

Project 182

Project Description
Multi National Company – Km1 Q4-02 Progressive Build -Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
July 03

Project 183

Project Description
Multi National Company -Pg8 Combined Project -Hook Up
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
Sept 03

Project 184

Project Description
Compressor Assembly for Trane chiller No 2
Project Owner
Mega Express Air Conditioning Sdn Bhd 737-3-8 Sri Sungai Nibong Complex Jalan Sultan Azlan Shah b ayan Lepas Penang
Completion Date
July 03

Project 185

Project Description
MNC-KM1/Pg7 & PG8 Mechanical Exhaust System Upgrading
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
July 2003

Project 186

Project Description
PCC -Installation Air cond & Exhaust System of Penang Christian Center At jalan Khaw Sim Bee
Project Owner
PENANG CHRISTIAN CENTER
Completion Date
Jan 2004

Project 187

Project Description
B & W Food Products Sdn Bhd -Hvac & Mechanical
Project Owner
B&W Food Products Sdn Bhd 4765 Lorong Permatang Pauh 13400 Butterworth
Completion Date
Sept 2002

Project 188

Project Description
MNC , Supply , Installation ,Delivery to Site T&C HVAC ducting , Piping & Utilities Work
Project Owner
Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam
Completion Date
April 2002

Project 189

Project Description
MNC Company Km1 FCPGA Phase 2 General Contractor Package
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
Jan 2002

Project 190

Project Description
IClarm The World Fish Center -Headquarter Renovation Project
Project Owner
International Center For Living Aquatics Resources Management -Jalan Batu Maung 11960 Bayan Lepas Penang
Completion Date
July 2001

Project 191

Project Description
ASIA Composite MFG -Hvac & Mechanical Package
Project Owner
ASIA COMPOSITE MFG
Completion Date
Feb 2001

Project 192

Project Description
SITT TATT Industrial Gases – Wafer Tech At Kulim Hi Tech
Project Owner
WAFER TECH
Completion Date
Dec 2000

Project 193

Project Description
Wafer Technology – Kulim Hi tech Park – Hvac & Mechanical Package
Project Owner
WAFER TECH
Completion Date
Julai 2000

Project 194

Project Description
MNC – FCPGA PPV/Tester Expansion
Project Owner
MNC Plot 8-12 & 39 Phase1 Kulim Hi Tech Park 09000 Kulim
Completion Date
October 2000

Project 195

Project Description
Applied Materials – Fit Out Work @ KHTP
Project Owner
Bovis (M) Sdn Bhd Level 11, tower 1 MNI Twins 11 Jalan Pinang 50450 Kuala Lumpur
Completion Date
Julai 2000

Project 196

Project Description
Federal Express -Air Cond & Ventilation System
Project Owner
Iviron (M) Sdn Bhd 68-B Jalan Masjid Negeri 11600 Pulau Pinang
Completion Date
April 2000

Project 197

Project Description
IP Softcom (M) Sddn Bhd -Air Cond & Ventilation system
Project Owner
MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang
Completion Date
March 2000

Project 198

Project Description
Muti National Company -KM1 Phase 3 -FCPGA -Hook UP
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
march 2000

Project 199

Project Description
Multi National Company KM1 -Retrofit -HVAC & Mechanical Package .
Project Owner
MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang
Completion Date
Mei 1999

Project 200

Project Description
QT HIGHTECH MALAYSIA SDN BHD
Project Owner
QT Hightech Malaysia Sdn Bhd
Completion Date
March 2012

Project 201

Project Description
Infineon Kulim
Project Owner
INFINEON TECHNOLOGIES (KULIM SDN BHD)
Completion Date
March 2012

Project 202

Project Description
Carsem (M Site) Sdn Bhd
Project Owner
CARSEM (M SITE) SDN BHD
Completion Date
March 2012

Project 203

Project Description
Gleneagles Medical Center Penang 1 Block 19 Storey Clinic & Wards With Carpark
Project Owner
GLENEAGLES MEDICAL GROUP
Completion Date
March 2012

Project 204

Project Description
Aman Central Shopping Mall at Alor Setar
Project Owner
Great Reality Sdn Bhd
Scope Of Work
Smoke Spill fan, make-up fresh air ductwork control panel & smoke control system at Aman Central Alor Setar
Start Date
1-Jun-2014
Completion Date
31 March 2015

Project 205

Project Description
First Solar BMS Wiring
Project Owner
First Solar
Scope Of Work
BMS Wiring works & control valves for First Solar KLM 1.5 Expansion Works
Start Date
1-Feb-2014
Completion Date
Jul 2014

Project 206

Project Description
WD Clean room system installation
Project Owner
Western Digita Sdn
Scope Of Work
PN1MA17 / 18 clean room modification mechanical,electrical services and architecture
Start Date
1-Mar-2014
Completion Date
Jul 2015

Project 207

Project Description
Aman Central Shopping Mall at Alor Setar
Project Owner
Great Reality Sdn Bhd
Scope Of Work
Mechanical Ventilation of HVAC services installation
Start Date
30-Oct-13
Completion Date
31-Mar-15

Project 208

Project Description
Mydin Kompleks Perniagaan 3 Tingkat (Parit Buntar Perak)
Project Owner
Simbol Teguh Sdn Bhd
Scope Of Work
Mechanical Ventilation of HVAC services installation
Start Date
15-Jun-13
Completion Date
30-Nov-14